PROJECT DEVELOPMENT
Barratt Homes
Artisan Place
Description
A large development of flats and houses. The SFS Load Bearing Pods to the top of the blocks and flats provided us with a new challenge that worked out exceptionally well.
Relevant Links
https://www.eos-facades.co.uk/case_study/artisan-place/
Details
156 Flats and Associated Communal and Commercial Areas
33 Houses
New Build
Scope of Work
Scope of Works
- EOS (SFS) Load Bearing Pods
- Fibre Screed
- Fibre Screed Laid to Falls on Balconies
- Visqueen Gas Barrier
- Instalay 65 Resilient Membrane
- Casoline MF Ceiling System
- Resilient Bar
- Gypwall Clasic 70mm Gypframe ‘C’ Stud Partition
- 15mm Firecase S Steel Protection
- Deflection Heads
- Fire Compartmentalisation
- 52.5mm Kingspan K118
- Multiboard
- Masterboard
- Gyptone Quattro 41 Acoustic Plasterboard
- Plasterboards: Wallboard, Soundbloc, Fireline and Moisture Resistant
- DriLyner Basic
- Tape and Joint
- EML and Plaster to Stair Winder
- Weber Pral M Render
- Weber OCR
- Weber Sil P Paint
Let's Build Something Exceptional
Partner with PM White Dry Lining for your next project.